Demolition FAQ.

Permits, asbestos, timelines, costs. Straight answers from a 22-year Melbourne demolition specialist.

Quotes & Cost

How much does it cost to demolish a house in Melbourne?

A standard single-storey residential demolition in Melbourne typically ranges from $15,000 to $25,000. Costs are driven by access, building size, materials (asbestos, brick, double brick), and the level of make-good required. We provide free written quotes within 24 hours.

Read the full cost guide →

How do I get a quote?

Three ways:

We respond within 24 hours and can arrange a site visit within 2-3 business days.

What does “rebuild-ready handover” mean?

The site is fully cleared, slab broken (if specified), services capped, fences removed, and ground levelled to natural surface or specified RL. Your builder can start excavation or footings the next working day — no surprises.

Full handover spec →

Permits & Approvals

Do I need a permit to demolish in Victoria?

Yes. In Victoria most demolitions require a Building Permit under the Building Act 1993, plus council Report and Consent for any building over 5 metres. We handle the entire permit process as part of our service.

Permit walkthrough →

Do you work in heritage overlay areas?

Yes. Heritage overlay demolition requires a planning permit in addition to building permit, with specific conditions around timing, retention, and salvage. We have experience navigating heritage approvals across Hawthorn, Kew, Carlton, Fitzroy, and other heritage suburbs.

Heritage process →

How long does the permit process take?

Standard residential building permit: 2-3 weeks from application to issue. Add 2-4 weeks for council Report and Consent. Heritage overlay can add 4-12 weeks. We submit and track everything on your behalf.

Safety & Compliance

What if my property contains asbestos?

We arrange a licensed asbestos survey before demolition. Any identified asbestos is removed by a Class A or B licensed removalist (depending on type) under WorkSafe Victoria oversight, before demolition begins. This is included in our quotes.

Asbestos process →

Are you licensed and insured?

Yes.

  • VBA Licence: CDB-U 12345
  • Public Liability: $20M coverage
  • WorkCover: Full WorkSafe Victoria compliance
  • ABN: 12 345 678 901

Documentation is provided to your builder or owner-builder on request.

How do you handle WorkSafe compliance?

Every job has a Safe Work Method Statement (SWMS), site induction for all workers, hazard register, and daily toolbox talks. We work to the WorkSafe Victoria Compliance Code for demolition.

WorkSafe details →

Timing & Logistics

How long does a house demolition take?

Most residential demolitions take 3-7 working days on site once permits are issued. Larger or asbestos-contaminated jobs can take longer. The permit and pre-demolition phase usually adds 2-6 weeks depending on council.

Full timeline guide →

Can you demolish next to operating businesses?

Yes. We regularly work in inner-city locations beside cafes, shops, and offices. Out-of-hours scheduling, dust suppression, hoarding, and traffic management are planned upfront to keep neighbours operating.

Commercial-adjacent work →

Will you clean up the site after demolition?

Yes — it is included in every quote. All materials are sorted and recycled where possible, with the site left swept and ready for the next trade. We also handle any required hardstand or temporary fencing.